See the details!

Questions? Visit our FAQ page or contact us and we’d be happy to help!

Scupper Drain

Scuppers must be fully wrapped with Duradek to prevent any separation of materials that could cause major leaks.

Posts

Posts should be wrapped up higher than potential waterline to avoid water seeping in.

Door sill

The door sill gets wrapped with Duradek above the height of the door, then the door is installed in a good bead of caulking.   No chance of leakage!

Drip Edge

Our PVC Coated drip edge makes for a beautiful finished edge.   The vinyl gets welded to it making for a seamless finish.

Open Stairs

All our steps are made of 2″ thick Engineered lumber, guaranteed not to warp or cup.   The LVL’s are ground smooth, then wrapped with Duradek.

Closed Stairs

Closed staircase the treads and rises covered in 5/8″ plywood then sheeted with vinyl.

Detail 7

The powder coated “L Trim” is installed to finish off the edge.

Detail 8

The stairs and any other details get welded.

Detail 9

The railings have been installed with a polyurethane caulking and stainless steel lag bolts.

Detail 10

The deck and railings are done. Nothing left to do but enjoy!